Microgrid
Premier Power Electric designs and constructs resilient microgrid electrical infrastructure by seamlessly integrating diverse distributed energy resources. We use a collaborative design-build approach to deliver safe, highly constructable, and efficient installations of complex switchgear, transformers, and control systems.
Microgrid Electrical Infrastructure
Premier Power Electric brings decades of heavy electrical construction experience to the deployment of microgrid systems. A reliable microgrid starts with practical design, careful planning, and quality installation. Our team applies real-world field experience to the installation and integration of switchgear, transformers, controls, and battery energy storage systems.
Whether a microgrid is designed for energy independence, peak demand reduction, or backup power, success depends on the proper integration of distributed energy resources (DERs). A design-build approach helps align project goals, budget, performance, efficiency, and long-term maintainability throughout the construction process.
Successful microgrid projects are built on several key elements:
- A clearly defined scope of work that establishes expectations for both grid-connected and island-mode operation from the beginning of the project.
- Well-defined responsibilities for each project participant. This is especially important when coordinating utility providers, equipment manufacturers, engineers, and installation contractors.
- An informed owner who can evaluate technologies such as Battery Energy Storage Systems (BESS), solar photovoltaic (PV) systems, and combined heat and power (CHP) generation, then make timely decisions to keep the project moving forward.
- An experienced project team that understands the safety requirements, code compliance, and technical challenges associated with bidirectional power systems, including NEC and IEEE 1547 requirements.
Strong coordination between the owner, utility providers, DER technology partners, and electrical contractors helps avoid the communication gaps and coordination challenges that often occur under traditional design-bid-build delivery methods.
Microgrid projects require team members who are experienced in their respective disciplines and capable of solving complex technical challenges. Success depends on collaboration, attention to detail, and a commitment to practical solutions. This is particularly important when working with switchgear paralleling systems, large power distribution equipment, and critical control wiring.
As a vendor-neutral contractor, Premier Power Electric works with a wide range of equipment manufacturers and technology providers. Our team has experience installing and integrating microgrid controllers, protective relays, SCADA systems, and supporting infrastructure to help owners achieve their operational and energy objectives.
Trade coordination is a critical part of every successful microgrid project. Careful planning of underground duct banks, substations, equipment placement, and rigging activities allows contractors to work more efficiently and reduces conflicts during construction. Early design review and coordination also support prefabrication opportunities and streamline field installation of complex AC and DC power systems.
Following commissioning, comprehensive testing and documentation provide facility operators with valuable information for future maintenance and system management. Point-to-point verification, functional testing, and load bank testing help confirm system performance and support long-term reliability.
Our process is focused on building dependable, maintainable electrical infrastructure that meets project requirements, supports operational resilience, and delivers lasting value.
Last updated: July 1st, 2026
Request Service
Ready to get started? Contact us for a consultation or quote for your microgrid needs.